Healthcare Project: The Village of Erin Meadows Care Facility

Back to All Projects

The addition to the Village of Erin Meadows care home facility features advanced electrical

systems to enhance safety and functionality.

  • Project Name: The Village of Erin Meadows
  • Project Address: 2930 Erin Centre Blvd Mississauga, ON L5M 7M4
  • Date Project Start: February 12, 2024
  • Date Project Completed: June 30, 2024
  • Project Value at Completion: $109,680
  • Project Manager: Chris Ure
  • Consultant: MNE Engineering Inc

Custm Electric implemented a comprehensive fire alarm system, integrated duct control dampers for optimal HVAC performance and safety, and upgraded the power infrastructure with new distribution. A data infrastructure will support high-speed connectivity, while energy-efficient LED lighting with smart controls will create a warm and inviting atmosphere.

This project aims to significantly improve the living environment for residents and staff.

Recent Post

Public library, lighting and power systems upgrade
September 24, 2024
Electrical work for a large-scale public library, including lighting and power systems.
A large warehouse filled with lots of boxes and pallets.
September 24, 2024
CUSTM Electrical was chosen to install the specialized electrical systems for Ground Effects’ paint booths. Their state-of-the-art facility demands precise, efficient, and safe electrical solutions to ensure optimal performance and compliance.
Industrial: Brunswick Brewery Renovation
September 23, 2024
Electrical work for a leading brewery, including process automation and lighting.
Fire Station 102 Expansion and Renovation
September 23, 2024
Electrical installations supporting critical public safety infrastructure.
COTA Health Renovation
September 23, 2024
Cota Health facility is designed to create a comprehensive environment for mental health and wellness services.
Share by: